![]() The drill plan is created for the specific tunnel segment, which results in higher precision in the tunnel development. This eliminates the need for going back and forth with drill plans between the office and the drill rig. The rig operator downloads the tunnel contour to the drill rig together with a drill rule file, and the drill rig generates its own drill plans. ![]() The Dynamic Tunneling package (DTP) is a software feature which lets the drill rig create custom made drill plans directly at the face of the tunnel. Overhaul program for excavator attachmentsĮlectronic Air Regulation Control System (EARS)īoomer underground jumbo drill rigs have a variety of automation features available. Refurbishment program for hydraulic breakers
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |